Tupperware is an American home products line that includes preparation, storage, and serving products for the kitchen and home. The company has several production facilities across the world.

ABOUT THE PROJECT

The energy savings project at Tupperware was completed in two phases in 2020 and 2022 in their factory at Athens, Greece. The first phase included the first production line and the second phase the second production line of the factory. A total of 22 customized interventions were installed which eliminated all the current harmonics and other power quality issues in the electrical installation. The savings achieved were 14.7% of total electricity consumption.

Tupperware

Read more about this project by downloading and viewing the report in PDF format

Report Download

Savings Achieved

14.7%

Payback Period

Tupperware

The energy savings project at Tupperware was completed in two phases in 2020 and 2022 in their factory at Athens, Greece. The first phase included the first production line and the second phase the second production line of the factory. A total of 22 customized interventions were installed which eliminated all the current harmonics and other power quality issues in the electrical installation. The savings achieved were 14.7% of total electricity consumption.

Location

Athens, Greece