ABOUT THE CLIENT
Wabtec is a leading global provider of equipment, systems, digital solutions, and value-added services. The project was implemented at their train part manufacturing facility.
ABOUT THE PROJECT
The project at Wabtec was concluded in late October of 2020 at the premises of their Coshocton, Ohio facility. The engineering study discovered dangerous levels of current and voltage harmonics which were causing major power losses in the electrical installation. Upon the completion of the project, significant energy savings were achieved at 9.66% of total electricity consumption.
Read more about this project by downloading and viewing the report in PDF format
Wabtec
The project at Wabtec was concluded in late October of 2020 at the premises of their Coshocton, Ohio facility. The engineering study discovered dangerous levels of current and voltage harmonics which were causing major power losses in the electrical installation. Upon the completion of the project, significant energy savings were achieved at 9.66% of total electricity consumption.
Location
Coshocton, OH, USA