Wabtec is a leading global provider of equipment, systems, digital solutions, and value-added services. The project was implemented at their train part manufacturing facility.

ΣΧΕΤΙΚΑ ΜΕ ΤΟ ΕΡΓΟ

The project at Wabtec was concluded in late October of 2020 at the premises of their Coshocton, Ohio facility. The engineering study discovered dangerous levels of current and voltage harmonics which were causing major power losses in the electrical installation. Upon the completion of the project, significant energy savings were achieved at 9.66% of total electricity consumption.

Wabtec

Διαβάστε περισσότερα για αυτό το έργο κατεβάζοντας και προβάλλοντας την αναφορά σε μορφή PDF

Λήψη αναφοράς

ΕΠΙΤΕΥΧΘΗΚΕ ΕΞΟΙΚΟΝΟΜΗΣΗ

9.66%

Περίοδος απόσβεσης

Wabtec

The project at Wabtec was concluded in late October of 2020 at the premises of their Coshocton, Ohio facility. The engineering study discovered dangerous levels of current and voltage harmonics which were causing major power losses in the electrical installation. Upon the completion of the project, significant energy savings were achieved at 9.66% of total electricity consumption.

Τοποθεσία

Coshocton, OH, USA